ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Prepared fresh or frozen fish and seafoods
3+ Characters Required for Products

73

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $444k 58k
MMBtu
$8.41
- Electrical $298k 4,492k
kWh
$0.074
- Natural Gas $56k 9.4k
MMBtu
$3.73

487

Recommendations

6.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $57k 5.4k
MMBtu
9.4%
- Electrical $51k 526k
kWh
11.7%
- Natural Gas $4.5k -
MMBtu
-
Waste $5.0k
Productivity/Other $78k
TOTAL $139k
*May be negative reflecting an increased cost component required to save energy and costs overall

70

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $445k 59k
MMBtu
$7.60
- Electrical $294k 4,610k
kWh
$0.066
- Natural Gas $58k 9.8k
MMBtu
$3.68

220

Implemented Recommendations

3.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $23k 2.3k
MMBtu
3.9%
- Electrical $17k 224k
kWh
4.9%
- Natural Gas $1.2k -
MMBtu
-
Waste $3.2k
Productivity/Other $39k
TOTAL $66k
*May be negative reflecting an increased cost component required to save energy and costs overall