ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Wines, brandy, and brandy spirits
3+ Characters Required for Products

72

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $545k 49k
MMBtu
$16.37
- Electrical $328k 3,145k
kWh
$0.71
- Natural Gas $71k 16k
MMBtu
$7.13

525

Recommendations

7.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $120k 9.0k
MMBtu
18.2%
- Electrical $109k 877k
kWh
27.9%
- Natural Gas $4.1k -
MMBtu
-
Waste $9.3k
Productivity/Other $23k
TOTAL $153k
*May be negative reflecting an increased cost component required to save energy and costs overall

63

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $452k 48k
MMBtu
$15.91
- Electrical $271k 2,861k
kWh
$0.79
- Natural Gas $71k 18k
MMBtu
$6.88

235

Implemented Recommendations

3.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $47k 3.5k
MMBtu
7.3%
- Electrical $40k 342k
kWh
12.0%
- Natural Gas $1.5k -
MMBtu
-
Waste $0.1k
Productivity/Other $5.9k
TOTAL $53k
*May be negative reflecting an increased cost component required to save energy and costs overall