ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Malt
3+ Characters Required for Products

9

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,487k 360k
MMBtu
$5.50
- Electrical $410k 15,316k
kWh
$0.032
- Natural Gas $870k 164k
MMBtu
$5.46

57

Recommendations

6.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $105k 11k
MMBtu
3.0%
- Electrical $36k 1,049k
kWh
6.9%
- Natural Gas $63k -
MMBtu
-
Waste $111k
Productivity/Other $42k
TOTAL $257k
*May be negative reflecting an increased cost component required to save energy and costs overall

9

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,487k 360k
MMBtu
$5.50
- Electrical $410k 15,316k
kWh
$0.032
- Natural Gas $870k 164k
MMBtu
$5.46

36

Implemented Recommendations

4.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $82k 8.7k
MMBtu
2.4%
- Electrical $28k 850k
kWh
5.6%
- Natural Gas $49k -
MMBtu
-
Waste $15k
Productivity/Other $41k
TOTAL $139k