ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Malt beverages
3+ Characters Required for Products

95

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $679k 92k
MMBtu
$10.15
- Electrical $261k 4,192k
kWh
$0.083
- Natural Gas $263k 47k
MMBtu
$6.41

653

Recommendations

6.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $75k 7.2k
MMBtu
7.8%
- Electrical $57k 707k
kWh
16.9%
- Natural Gas $9.1k -
MMBtu
-
Waste $11k
Productivity/Other $86k
TOTAL $172k
*May be negative reflecting an increased cost component required to save energy and costs overall

91

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $669k 94k
MMBtu
$9.83
- Electrical $259k 4,310k
kWh
$0.079
- Natural Gas $256k 47k
MMBtu
$6.25

298

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $27k 1.8k
MMBtu
1.9%
- Electrical $13k 171k
kWh
4.0%
- Natural Gas $10.0k -
MMBtu
-
Waste $0.6k
Productivity/Other $70k
TOTAL $98k