ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Beverages
3+ Characters Required for Products

456

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $803k 132k
MMBtu
$8.98
- Electrical $404k 6,717k
kWh
$0.17
- Natural Gas $223k 43k
MMBtu
$5.87

3,452

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $94k 7.4k
MMBtu
5.6%
- Electrical $56k 717k
kWh
10.7%
- Natural Gas $20k -
MMBtu
-
Waste $32k
Productivity/Other $46k
TOTAL $173k
*May be negative reflecting an increased cost component required to save energy and costs overall

430

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $751k 128k
MMBtu
$8.65
- Electrical $386k 6,563k
kWh
$0.17
- Natural Gas $214k 41k
MMBtu
$5.74

1,593

Implemented Recommendations

3.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $35k 3.1k
MMBtu
2.5%
- Electrical $21k 306k
kWh
4.7%
- Natural Gas $9.4k -
MMBtu
-
Waste $5.2k
Productivity/Other $21k
TOTAL $61k
*May be negative reflecting an increased cost component required to save energy and costs overall