ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Beverages
3+ Characters Required for Products

445

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $770k 131k
MMBtu
$8.83
- Electrical $394k 6,723k
kWh
$0.17
- Natural Gas $218k 43k
MMBtu
$5.77

3,368

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $91k 7.3k
MMBtu
5.6%
- Electrical $54k 713k
kWh
10.6%
- Natural Gas $20k -
MMBtu
-
Waste $33k
Productivity/Other $45k
TOTAL $168k
*May be negative reflecting an increased cost component required to save energy and costs overall

418

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $728k 125k
MMBtu
$8.62
- Electrical $367k 6,229k
kWh
$0.17
- Natural Gas $216k 41k
MMBtu
$5.67

1,531

Implemented Recommendations

3.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $32k 2.9k
MMBtu
2.3%
- Electrical $19k 281k
kWh
4.5%
- Natural Gas $8.5k -
MMBtu
-
Waste $2.8k
Productivity/Other $18k
TOTAL $53k
*May be negative reflecting an increased cost component required to save energy and costs overall