ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Beverages
3+ Characters Required for Products

447

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $769k 131k
MMBtu
$8.86
- Electrical $394k 6,703k
kWh
$0.17
- Natural Gas $218k 43k
MMBtu
$5.80

3,381

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $91k 7.3k
MMBtu
5.6%
- Electrical $54k 711k
kWh
10.6%
- Natural Gas $20k -
MMBtu
-
Waste $33k
Productivity/Other $45k
TOTAL $168k
*May be negative reflecting an increased cost component required to save energy and costs overall

422

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $728k 125k
MMBtu
$8.65
- Electrical $367k 6,215k
kWh
$0.17
- Natural Gas $216k 41k
MMBtu
$5.72

1,551

Implemented Recommendations

3.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $33k 2.9k
MMBtu
2.3%
- Electrical $19k 281k
kWh
4.5%
- Natural Gas $9.5k -
MMBtu
-
Waste $5.3k
Productivity/Other $18k
TOTAL $56k
*May be negative reflecting an increased cost component required to save energy and costs overall