ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Soybean oil mills
3+ Characters Required for Products

7

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $3,323k 721k
MMBtu
$5.52
- Electrical $1,317k 29,167k
kWh
$0.052
- Natural Gas $1,584k 402k
MMBtu
$4.13

43

Recommendations

6.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $373k 28k
MMBtu
3.8%
- Electrical $132k 2,694k
kWh
9.2%
- Natural Gas $199k -
MMBtu
-
Waste $788k
Productivity/Other ($-24.7)k
TOTAL $1,137k
*May be negative reflecting an increased cost component required to save energy and costs overall

6

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $3,577k 807k
MMBtu
$4.99
- Electrical $1,237k 30,656k
kWh
$0.045
- Natural Gas $1,848k 469k
MMBtu
$4.82

24

Implemented Recommendations

4.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $46k 1.7k
MMBtu
0.2%
- Electrical $8.0k 164k
kWh
0.5%
- Natural Gas $35k -
MMBtu
-
Waste $0.4k
Productivity/Other $36k
TOTAL $82k