ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Salted and roasted nuts and seeds
3+ Characters Required for Products

23

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $932k 114k
MMBtu
$9.62
- Electrical $553k 7,460k
kWh
$0.076
- Natural Gas $228k 29k
MMBtu
$5.24

184

Recommendations

8.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $159k 16k
MMBtu
13.9%
- Electrical $121k 1,546k
kWh
20.7%
- Natural Gas $12k -
MMBtu
-
Waste $4.1k
Productivity/Other $3.9k
TOTAL $167k
*May be negative reflecting an increased cost component required to save energy and costs overall

22

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $964k 118k
MMBtu
$9.66
- Electrical $574k 7,729k
kWh
$0.077
- Natural Gas $235k 30k
MMBtu
$5.10

94

Implemented Recommendations

4.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $68k 5.9k
MMBtu
5.0%
- Electrical $55k 576k
kWh
7.5%
- Natural Gas $7.5k -
MMBtu
-
Waste $1.4k
Productivity/Other $1.1k
TOTAL $70k
*May be negative reflecting an increased cost component required to save energy and costs overall