ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Chewing gum
3+ Characters Required for Products

3

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,560k 173k
MMBtu
$9.25
- Electrical $752k 10,214k
kWh
$0.073
- Natural Gas $515k 69k
MMBtu
$8.20

30

Recommendations

10.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $229k 23k
MMBtu
13.4%
- Electrical $173k 2,262k
kWh
22.1%
- Natural Gas $38k -
MMBtu
-
Waste $3.9k
Productivity/Other $3.6k
TOTAL $237k
*May be negative reflecting an increased cost component required to save energy and costs overall

2

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,451k 183k
MMBtu
$8.12
- Electrical $714k 9,948k
kWh
$0.072
- Natural Gas $489k 81k
MMBtu
$5.87

14

Implemented Recommendations

7.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $103k 6.3k
MMBtu
3.4%
- Electrical $47k 612k
kWh
6.2%
- Natural Gas $42k -
MMBtu
-
Waste -
Productivity/Other $1.8k
TOTAL $105k
*May be negative reflecting an increased cost component required to save energy and costs overall