ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Chocolate and cocoa products
3+ Characters Required for Products

17

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,329k 163k
MMBtu
$8.83
- Electrical $706k 10,561k
kWh
$0.078
- Natural Gas $435k 52k
MMBtu
$6.61

148

Recommendations

8.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $140k 14k
MMBtu
8.5%
- Electrical $120k 1,346k
kWh
12.7%
- Natural Gas $11k -
MMBtu
-
Waste $15k
Productivity/Other $13k
TOTAL $169k
*May be negative reflecting an increased cost component required to save energy and costs overall

16

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,339k 158k
MMBtu
$9.08
- Electrical $698k 10,134k
kWh
$0.079
- Natural Gas $444k 51k
MMBtu
$6.72

68

Implemented Recommendations

4.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $40k 3.6k
MMBtu
2.3%
- Electrical $29k 347k
kWh
3.4%
- Natural Gas $8.5k -
MMBtu
-
Waste $13k
Productivity/Other $6.0k
TOTAL $60k
*May be negative reflecting an increased cost component required to save energy and costs overall