ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Candy and other confectionery products
3+ Characters Required for Products

68

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $495k 83k
MMBtu
$7.25
- Electrical $267k 4,761k
kWh
$0.068
- Natural Gas $159k 32k
MMBtu
$5.18

502

Recommendations

7.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $50k 4.8k
MMBtu
5.8%
- Electrical $29k 468k
kWh
9.8%
- Natural Gas $17k -
MMBtu
-
Waste $13k
Productivity/Other $42k
TOTAL $105k
*May be negative reflecting an increased cost component required to save energy and costs overall

66

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $505k 85k
MMBtu
$7.12
- Electrical $273k 4,868k
kWh
$0.069
- Natural Gas $163k 33k
MMBtu
$5.26

199

Implemented Recommendations

3.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $16k 1.6k
MMBtu
1.8%
- Electrical $9.9k 152k
kWh
3.1%
- Natural Gas $5.0k -
MMBtu
-
Waste $12k
Productivity/Other $5.8k
TOTAL $34k
*May be negative reflecting an increased cost component required to save energy and costs overall