ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Cane sugar refining
3+ Characters Required for Products

7

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $3,969k 1,177k
MMBtu
$4.17
- Electrical $545k 6,283k
kWh
$0.077
- Natural Gas $2,985k 767k
MMBtu
$3.39

63

Recommendations

9.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $340k 34k
MMBtu
2.9%
- Electrical $268k 3,307k
kWh
52.6%
- Natural Gas $70k -
MMBtu
-
Waste $2.2k
Productivity/Other $119k
TOTAL $461k
*May be negative reflecting an increased cost component required to save energy and costs overall

7

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $3,969k 1,177k
MMBtu
$4.17
- Electrical $545k 6,283k
kWh
$0.077
- Natural Gas $2,985k 767k
MMBtu
$3.39

30

Implemented Recommendations

4.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $132k 14k
MMBtu
1.2%
- Electrical $120k 1,389k
kWh
22.1%
- Natural Gas $18k -
MMBtu
-
Waste -
Productivity/Other $9.5k
TOTAL $141k
*May be negative reflecting an increased cost component required to save energy and costs overall