ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Cane sugar, except refining
3+ Characters Required for Products

7

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $840k 114k
MMBtu
$9.42
- Electrical $530k 6,453k
kWh
$0.086
- Natural Gas $219k 48k
MMBtu
$2.57

47

Recommendations

6.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $51k 3.0k
MMBtu
2.6%
- Electrical $26k 293k
kWh
4.5%
- Natural Gas $24k -
MMBtu
-
Waste -
Productivity/Other $0.2k
TOTAL $51k
*May be negative reflecting an increased cost component required to save energy and costs overall

7

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $840k 114k
MMBtu
$9.42
- Electrical $530k 6,453k
kWh
$0.086
- Natural Gas $219k 48k
MMBtu
$2.57

17

Implemented Recommendations

2.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $16k 1.1k
MMBtu
1.0%
- Electrical $10k 107k
kWh
1.7%
- Natural Gas $5.4k -
MMBtu
-
Waste -
Productivity/Other $0.2k
TOTAL $16k
*May be negative reflecting an increased cost component required to save energy and costs overall