ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Sugar and confectionery products
3+ Characters Required for Products

131

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $974k 203k
MMBtu
$7.63
- Electrical $416k 6,443k
kWh
$0.071
- Natural Gas $389k 80k
MMBtu
$5.12

1,009

Recommendations

7.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $108k 10k
MMBtu
5.1%
- Electrical $75k 1,003k
kWh
15.6%
- Natural Gas $20k -
MMBtu
-
Waste $9.5k
Productivity/Other $31k
TOTAL $148k
*May be negative reflecting an increased cost component required to save energy and costs overall

126

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $985k 208k
MMBtu
$7.55
- Electrical $417k 6,443k
kWh
$0.071
- Natural Gas $397k 82k
MMBtu
$5.08

449

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $40k 3.4k
MMBtu
1.6%
- Electrical $27k 328k
kWh
5.1%
- Natural Gas $7.1k -
MMBtu
-
Waste $8.4k
Productivity/Other $4.5k
TOTAL $53k
*May be negative reflecting an increased cost component required to save energy and costs overall