ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Sugar and confectionery products
3+ Characters Required for Products

131

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $974k 203k
MMBtu
$7.63
- Electrical $416k 6,443k
kWh
$0.071
- Natural Gas $389k 80k
MMBtu
$5.12

1,009

Recommendations

7.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $108k 10k
MMBtu
5.1%
- Electrical $75k 1,003k
kWh
15.6%
- Natural Gas $20k -
MMBtu
-
Waste $9.5k
Productivity/Other $31k
TOTAL $148k
*May be negative reflecting an increased cost component required to save energy and costs overall

127

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $978k 206k
MMBtu
$7.61
- Electrical $414k 6,394k
kWh
$0.071
- Natural Gas $393k 81k
MMBtu
$5.04

452

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $39k 3.3k
MMBtu
1.6%
- Electrical $27k 325k
kWh
5.1%
- Natural Gas $7.0k -
MMBtu
-
Waste $8.3k
Productivity/Other $4.5k
TOTAL $52k
*May be negative reflecting an increased cost component required to save energy and costs overall