ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Cookies and crackers
3+ Characters Required for Products

50

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $815k 130k
MMBtu
$7.01
- Electrical $354k 6,413k
kWh
$0.062
- Natural Gas $340k 64k
MMBtu
$5.83

391

Recommendations

7.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $88k 8.8k
MMBtu
6.7%
- Electrical $51k 857k
kWh
13.4%
- Natural Gas $33k -
MMBtu
-
Waste $7.4k
Productivity/Other $42k
TOTAL $137k
*May be negative reflecting an increased cost component required to save energy and costs overall

46

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $856k 138k
MMBtu
$6.58
- Electrical $367k 6,736k
kWh
$0.059
- Natural Gas $364k 69k
MMBtu
$5.76

186

Implemented Recommendations

4.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $25k 1.9k
MMBtu
1.4%
- Electrical $11k 189k
kWh
2.8%
- Natural Gas $11k -
MMBtu
-
Waste $7.2k
Productivity/Other $14k
TOTAL $46k
*May be negative reflecting an increased cost component required to save energy and costs overall