ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Cookies and crackers
3+ Characters Required for Products

51

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $809k 129k
MMBtu
$7.01
- Electrical $354k 6,373k
kWh
$0.062
- Natural Gas $336k 64k
MMBtu
$5.83

397

Recommendations

7.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $87k 8.5k
MMBtu
6.6%
- Electrical $50k 833k
kWh
13.1%
- Natural Gas $34k -
MMBtu
-
Waste $7.5k
Productivity/Other $41k
TOTAL $136k
*May be negative reflecting an increased cost component required to save energy and costs overall

48

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $834k 134k
MMBtu
$6.75
- Electrical $361k 6,568k
kWh
$0.060
- Natural Gas $350k 66k
MMBtu
$5.67

187

Implemented Recommendations

3.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $24k 1.9k
MMBtu
1.4%
- Electrical $11k 184k
kWh
2.8%
- Natural Gas $11k -
MMBtu
-
Waste $7.5k
Productivity/Other $13k
TOTAL $45k
*May be negative reflecting an increased cost component required to save energy and costs overall