ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Bread and other bakery products, except cookies and crackers
3+ Characters Required for Products

253

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $712k 109k
MMBtu
$6.92
- Electrical $362k 6,238k
kWh
$0.061
- Natural Gas $250k 45k
MMBtu
$5.86

1,890

Recommendations

7.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $69k 7.0k
MMBtu
6.4%
- Electrical $42k 686k
kWh
11.0%
- Natural Gas $15k -
MMBtu
-
Waste $10k
Productivity/Other $30k
TOTAL $109k
*May be negative reflecting an increased cost component required to save energy and costs overall

245

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $706k 108k
MMBtu
$6.93
- Electrical $359k 6,166k
kWh
$0.062
- Natural Gas $247k 45k
MMBtu
$5.84

895

Implemented Recommendations

3.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $28k 3.0k
MMBtu
2.8%
- Electrical $18k 297k
kWh
4.8%
- Natural Gas $5.3k -
MMBtu
-
Waste $4.6k
Productivity/Other $11k
TOTAL $45k