ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Bakery products
3+ Characters Required for Products

318

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $727k 113k
MMBtu
$7.00
- Electrical $363k 6,419k
kWh
$0.061
- Natural Gas $257k 47k
MMBtu
$5.89

2,417

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $72k 7.7k
MMBtu
6.8%
- Electrical $46k 750k
kWh
11.7%
- Natural Gas $15k -
MMBtu
-
Waste $9.9k
Productivity/Other $35k
TOTAL $118k
*May be negative reflecting an increased cost component required to save energy and costs overall

306

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $728k 114k
MMBtu
$6.83
- Electrical $366k 6,464k
kWh
$0.061
- Natural Gas $258k 47k
MMBtu
$5.80

1,139

Implemented Recommendations

3.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $27k 2.8k
MMBtu
2.4%
- Electrical $17k 271k
kWh
4.2%
- Natural Gas $6.5k -
MMBtu
-
Waste $4.8k
Productivity/Other $12k
TOTAL $44k
*May be negative reflecting an increased cost component required to save energy and costs overall