ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Wet corn milling
3+ Characters Required for Products

5

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $4,094k 919k
MMBtu
$5.25
- Electrical $1,320k 37,033k
kWh
$0.052
- Natural Gas $1,234k 298k
MMBtu
$3.05

36

Recommendations

7.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $52k 4.6k
MMBtu
0.5%
- Electrical $22k 446k
kWh
1.2%
- Natural Gas $4.3k -
MMBtu
-
Waste $2.2k
Productivity/Other -
TOTAL $54k
*May be negative reflecting an increased cost component required to save energy and costs overall

5

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $4,094k 919k
MMBtu
$5.25
- Electrical $1,320k 37,033k
kWh
$0.052
- Natural Gas $1,234k 298k
MMBtu
$3.05

15

Implemented Recommendations

3.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $13k 1.5k
MMBtu
0.2%
- Electrical $9.0k 146k
kWh
0.4%
- Natural Gas $0.1k -
MMBtu
-
Waste $1.4k
Productivity/Other -
TOTAL $14k
*May be negative reflecting an increased cost component required to save energy and costs overall