ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Prepared flour mixes and doughs
3+ Characters Required for Products

22

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $708k 118k
MMBtu
$6.15
- Electrical $436k 8,430k
kWh
$0.054
- Natural Gas $136k 30k
MMBtu
$4.74

176

Recommendations

8.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $40k 4.8k
MMBtu
4.0%
- Electrical $28k 465k
kWh
5.5%
- Natural Gas $6.4k -
MMBtu
-
Waste $2.8k
Productivity/Other $30k
TOTAL $73k
*May be negative reflecting an increased cost component required to save energy and costs overall

21

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $703k 119k
MMBtu
$6.00
- Electrical $446k 8,618k
kWh
$0.054
- Natural Gas $125k 30k
MMBtu
$4.56

77

Implemented Recommendations

3.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $14k 2.1k
MMBtu
1.8%
- Electrical $10k 205k
kWh
2.4%
- Natural Gas $2.2k -
MMBtu
-
Waste $1.0k
Productivity/Other $30k
TOTAL $45k