ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Cereal breakfast foods
3+ Characters Required for Products

17

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,827k 317k
MMBtu
$7.22
- Electrical $792k 17,511k
kWh
$0.058
- Natural Gas $702k 136k
MMBtu
$6.53

153

Recommendations

9.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $149k 21k
MMBtu
6.6%
- Electrical $102k 2,047k
kWh
11.7%
- Natural Gas $29k -
MMBtu
-
Waste $8.1k
Productivity/Other $10k
TOTAL $168k
*May be negative reflecting an increased cost component required to save energy and costs overall

15

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,924k 349k
MMBtu
$6.15
- Electrical $826k 19,170k
kWh
$0.050
- Natural Gas $748k 150k
MMBtu
$5.82

58

Implemented Recommendations

3.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $55k 4.8k
MMBtu
1.4%
- Electrical $26k 470k
kWh
2.5%
- Natural Gas $25k -
MMBtu
-
Waste $2.1k
Productivity/Other $1.2k
TOTAL $58k
*May be negative reflecting an increased cost component required to save energy and costs overall