ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Cereal breakfast foods
3+ Characters Required for Products

2

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,463k 214k
MMBtu
$7.05
- Electrical $897k 12,660k
kWh
$0.070
- Natural Gas $317k 85k
MMBtu
$3.76

21

Recommendations

10.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $124k 6.9k
MMBtu
3.2%
- Electrical $55k 670k
kWh
5.3%
- Natural Gas $63k -
MMBtu
-
Waste $53k
Productivity/Other $5.4k
TOTAL $182k
*May be negative reflecting an increased cost component required to save energy and costs overall

2

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,463k 214k
MMBtu
$7.05
- Electrical $897k 12,660k
kWh
$0.070
- Natural Gas $317k 85k
MMBtu
$3.76

15

Implemented Recommendations

7.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $113k 6.4k
MMBtu
3.0%
- Electrical $51k 629k
kWh
5.0%
- Natural Gas $58k -
MMBtu
-
Waste $6.1k
Productivity/Other $5.9k
TOTAL $125k