ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Flour and other grain mill products
3+ Characters Required for Products

45

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,110k 228k
MMBtu
$5.98
- Electrical $669k 15,456k
kWh
$0.051
- Natural Gas $208k 55k
MMBtu
$4.60

338

Recommendations

7.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $67k 9.1k
MMBtu
4.0%
- Electrical $44k 891k
kWh
5.8%
- Natural Gas $6.7k -
MMBtu
-
Waste $3.9k
Productivity/Other $145k
TOTAL $216k
*May be negative reflecting an increased cost component required to save energy and costs overall

43

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,120k 233k
MMBtu
$5.85
- Electrical $663k 15,634k
kWh
$0.050
- Natural Gas $216k 58k
MMBtu
$4.05

148

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $25k 3.6k
MMBtu
1.5%
- Electrical $18k 349k
kWh
2.2%
- Natural Gas $2.5k -
MMBtu
-
Waste $0.2k
Productivity/Other $13k
TOTAL $39k
*May be negative reflecting an increased cost component required to save energy and costs overall