ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Grain mill products
3+ Characters Required for Products

286

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $842k 162k
MMBtu
$6.66
- Electrical $408k 8,957k
kWh
$0.059
- Natural Gas $269k 62k
MMBtu
$4.65

2,157

Recommendations

7.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $67k 8.2k
MMBtu
5.1%
- Electrical $39k 803k
kWh
9.0%
- Natural Gas $14k -
MMBtu
-
Waste $2.6k
Productivity/Other $53k
TOTAL $123k
*May be negative reflecting an increased cost component required to save energy and costs overall

277

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $848k 166k
MMBtu
$6.45
- Electrical $409k 9,094k
kWh
$0.058
- Natural Gas $275k 64k
MMBtu
$4.64

1,046

Implemented Recommendations

3.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $28k 2.4k
MMBtu
1.4%
- Electrical $12k 231k
kWh
2.5%
- Natural Gas $9.8k -
MMBtu
-
Waste $0.6k
Productivity/Other $14k
TOTAL $42k
*May be negative reflecting an increased cost component required to save energy and costs overall