ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Dried and dehydrated fruits, vegetables, and soup mixes
3+ Characters Required for Products

26

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,063k 183k
MMBtu
$7.41
- Electrical $343k 6,746k
kWh
$0.065
- Natural Gas $520k 107k
MMBtu
$4.55

205

Recommendations

7.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $161k 14k
MMBtu
7.7%
- Electrical $97k 1,385k
kWh
20.5%
- Natural Gas $46k -
MMBtu
-
Waste $19k
Productivity/Other $72k
TOTAL $252k
*May be negative reflecting an increased cost component required to save energy and costs overall

24

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,135k 197k
MMBtu
$7.00
- Electrical $367k 7,237k
kWh
$0.064
- Natural Gas $558k 115k
MMBtu
$4.05

98

Implemented Recommendations

4.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $110k 11k
MMBtu
5.6%
- Electrical $73k 1,085k
kWh
15.0%
- Natural Gas $29k -
MMBtu
-
Waste $7.1k
Productivity/Other $4.1k
TOTAL $121k
*May be negative reflecting an increased cost component required to save energy and costs overall