ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Canned specialties
3+ Characters Required for Products

33

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,515k 242k
MMBtu
$6.78
- Electrical $574k 10,318k
kWh
$0.062
- Natural Gas $755k 134k
MMBtu
$5.09

277

Recommendations

8.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $134k 9.5k
MMBtu
3.9%
- Electrical $79k 924k
kWh
9.0%
- Natural Gas $39k -
MMBtu
-
Waste $33k
Productivity/Other $57k
TOTAL $224k
*May be negative reflecting an increased cost component required to save energy and costs overall

32

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,534k 246k
MMBtu
$6.78
- Electrical $585k 10,441k
kWh
$0.063
- Natural Gas $769k 136k
MMBtu
$5.11

124

Implemented Recommendations

3.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $39k 1.3k
MMBtu
0.5%
- Electrical $9.6k 127k
kWh
1.2%
- Natural Gas $26k -
MMBtu
-
Waste $16k
Productivity/Other $31k
TOTAL $86k
*May be negative reflecting an increased cost component required to save energy and costs overall