ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Dry, condensed, and evaporated dairy products
3+ Characters Required for Products

36

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,045k 229k
MMBtu
$6.82
- Electrical $425k 8,176k
kWh
$0.065
- Natural Gas $422k 78k
MMBtu
$4.98

278

Recommendations

7.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $84k 5.9k
MMBtu
2.6%
- Electrical $35k 573k
kWh
7.0%
- Natural Gas $35k -
MMBtu
-
Waste $20k
Productivity/Other $27k
TOTAL $130k
*May be negative reflecting an increased cost component required to save energy and costs overall

34

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $999k 233k
MMBtu
$6.43
- Electrical $400k 8,237k
kWh
$0.061
- Natural Gas $403k 78k
MMBtu
$4.68

145

Implemented Recommendations

4.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $36k 3.7k
MMBtu
1.6%
- Electrical $17k 359k
kWh
4.4%
- Natural Gas $11k -
MMBtu
-
Waste $0.3k
Productivity/Other $7.1k
TOTAL $44k
*May be negative reflecting an increased cost component required to save energy and costs overall