ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Dairy products
3+ Characters Required for Products

354

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $915k 160k
MMBtu
$6.48
- Electrical $463k 9,616k
kWh
$0.056
- Natural Gas $245k 50k
MMBtu
$4.83

2,785

Recommendations

7.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $91k 10k
MMBtu
6.5%
- Electrical $58k 1,024k
kWh
10.6%
- Natural Gas $21k -
MMBtu
-
Waste $10k
Productivity/Other $66k
TOTAL $167k
*May be negative reflecting an increased cost component required to save energy and costs overall

341

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $865k 157k
MMBtu
$6.29
- Electrical $447k 9,436k
kWh
$0.055
- Natural Gas $233k 49k
MMBtu
$4.73

1,313

Implemented Recommendations

3.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $31k 3.1k
MMBtu
2.0%
- Electrical $17k 301k
kWh
3.2%
- Natural Gas $8.4k -
MMBtu
-
Waste $2.8k
Productivity/Other $30k
TOTAL $64k