ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Meat products
3+ Characters Required for Products

379

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $995k 172k
MMBtu
$6.35
- Electrical $512k 10,830k
kWh
$0.056
- Natural Gas $313k 58k
MMBtu
$4.96

2,977

Recommendations

7.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $88k 7.0k
MMBtu
4.1%
- Electrical $42k 684k
kWh
6.3%
- Natural Gas $29k -
MMBtu
-
Waste $9.0k
Productivity/Other $28k
TOTAL $125k
*May be negative reflecting an increased cost component required to save energy and costs overall

371

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,002k 173k
MMBtu
$6.26
- Electrical $515k 10,966k
kWh
$0.055
- Natural Gas $316k 58k
MMBtu
$4.96

1,411

Implemented Recommendations

3.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $27k 2.3k
MMBtu
1.3%
- Electrical $13k 220k
kWh
2.0%
- Natural Gas $11k -
MMBtu
-
Waste $2.8k
Productivity/Other $10k
TOTAL $40k
*May be negative reflecting an increased cost component required to save energy and costs overall