ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Food and kindred products
3+ Characters Required for Products

2,793

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $881k 154k
MMBtu
$8.69
- Electrical $431k 8,108k
kWh
$0.088
- Natural Gas $285k 60k
MMBtu
$5.07

21,321

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $89k 8.4k
MMBtu
5.5%
- Electrical $54k 820k
kWh
10.1%
- Natural Gas $19k -
MMBtu
-
Waste $15k
Productivity/Other $50k
TOTAL $154k
*May be negative reflecting an increased cost component required to save energy and costs overall

2,706

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $872k 154k
MMBtu
$8.60
- Electrical $427k 8,116k
kWh
$0.088
- Natural Gas $284k 60k
MMBtu
$5.02

9,997

Implemented Recommendations

3.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $32k 2.9k
MMBtu
1.9%
- Electrical $18k 282k
kWh
3.5%
- Natural Gas $9.1k -
MMBtu
-
Waste $4.3k
Productivity/Other $21k
TOTAL $57k