ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Food and kindred products
3+ Characters Required for Products

2,747

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $875k 154k
MMBtu
$8.63
- Electrical $429k 8,139k
kWh
$0.088
- Natural Gas $285k 60k
MMBtu
$5.04

20,978

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $89k 8.4k
MMBtu
5.4%
- Electrical $53k 818k
kWh
10.0%
- Natural Gas $21k -
MMBtu
-
Waste $15k
Productivity/Other $49k
TOTAL $153k
*May be negative reflecting an increased cost component required to save energy and costs overall

2,634

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $853k 153k
MMBtu
$8.51
- Electrical $417k 8,018k
kWh
$0.088
- Natural Gas $282k 60k
MMBtu
$4.96

9,763

Implemented Recommendations

3.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $31k 2.8k
MMBtu
1.8%
- Electrical $17k 269k
kWh
3.3%
- Natural Gas $8.7k -
MMBtu
-
Waste $3.8k
Productivity/Other $19k
TOTAL $54k
*May be negative reflecting an increased cost component required to save energy and costs overall