ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Food and kindred products
3+ Characters Required for Products

2,829

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $886k 153k
MMBtu
$8.74
- Electrical $434k 8,121k
kWh
$0.088
- Natural Gas $283k 59k
MMBtu
$5.08

21,587

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $90k 8.5k
MMBtu
5.6%
- Electrical $55k 832k
kWh
10.2%
- Natural Gas $20k -
MMBtu
-
Waste $15k
Productivity/Other $57k
TOTAL $162k
*May be negative reflecting an increased cost component required to save energy and costs overall

2,740

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $873k 153k
MMBtu
$8.64
- Electrical $428k 8,108k
kWh
$0.088
- Natural Gas $284k 60k
MMBtu
$5.03

10,074

Implemented Recommendations

3.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $32k 2.9k
MMBtu
1.9%
- Electrical $18k 280k
kWh
3.5%
- Natural Gas $9.0k -
MMBtu
-
Waste $4.3k
Productivity/Other $21k
TOTAL $57k
*May be negative reflecting an increased cost component required to save energy and costs overall