ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Construction special trade contractors
3+ Characters Required for Products

5

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,742k 248k
MMBtu
$11.61
- Electrical $576k 10,765k
kWh
$0.11
- Natural Gas $197k 26k
MMBtu
$2.87

37

Recommendations

7.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $146k 6.0k
MMBtu
2.4%
- Electrical $41k 583k
kWh
5.4%
- Natural Gas $0.1k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $146k
*May be negative reflecting an increased cost component required to save energy and costs overall

5

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,742k 248k
MMBtu
$11.61
- Electrical $576k 10,765k
kWh
$0.11
- Natural Gas $197k 26k
MMBtu
$2.87

21

Implemented Recommendations

4.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $112k 2.2k
MMBtu
0.9%
- Electrical $20k 217k
kWh
2.0%
- Natural Gas $0.1k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $112k
*May be negative reflecting an increased cost component required to save energy and costs overall