The ITAC Statistics page displays the average assessment results for the selected criteria.
6
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $434k | 56k |
MMBtu
|
$7.85 |
- Electrical | $238k | 4,988k |
kWh
|
$0.044 |
- Natural Gas | $36k | 5.1k |
MMBtu
|
$6.23 |
38
Recommendations
6.3
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $64k | 7.0k |
MMBtu
|
12.3% |
- Electrical | $33k | 678k |
kWh
|
13.6% |
- Natural Gas | $1.8k | - |
MMBtu
|
- |
Waste | $1.3k | |||
Productivity/Other | $13k | |||
TOTAL | $79k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
6
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $434k | 56k |
MMBtu
|
$7.85 |
- Electrical | $238k | 4,988k |
kWh
|
$0.044 |
- Natural Gas | $36k | 5.1k |
MMBtu
|
$6.23 |
16
Implemented Recommendations
2.7
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $20k | 2.1k |
MMBtu
|
3.8% |
- Electrical | $9.3k | 207k |
kWh
|
4.2% |
- Natural Gas | $0.9k | - |
MMBtu
|
- |
Waste | - | |||
Productivity/Other | $13k | |||
TOTAL | $33k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |