The ITAC Statistics page displays the average assessment results for the selected criteria.
1
Matching Assessments
| Initial Plant Size Averages | Costs | Usage | Unit Cost | |
|---|---|---|---|---|
| All Energy | $1,354k | 67k |
MMBtu
|
$20.22 |
| - Electrical | $49k | 683k |
kWh
|
$0.072 |
| - Natural Gas | - | - |
MMBtu
|
- |
4
Recommendations
4.0
Recommendations Per Assessment
| Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
|---|---|---|---|---|
| All Energy | $2.2k | (-2.1)k |
MMBtu
|
(-3.1)% |
| - Electrical | ($-14.5)k | (-202.7)k |
kWh
|
(-29.7)% |
| - Natural Gas | - | - |
MMBtu
|
- |
| Waste | - | |||
| Productivity/Other | $208k | |||
| TOTAL | $210k | |||
| *May be negative reflecting an increased cost component required to save energy and costs overall | ||||
0
with Implementation Data
| Initial Plant Size Averages | Costs | Usage | Unit Cost | |
|---|---|---|---|---|
| All Energy | - | - |
MMBtu
|
- |
| - Electrical | - | - |
kWh
|
- |
| - Natural Gas | - | - |
MMBtu
|
- |
0
Implemented Recommendations
0.0
Implemented Per Assessment
| Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
|---|---|---|---|---|
| All Energy | - | - |
MMBtu
|
- |
| - Electrical | - | - |
kWh
|
- |
| - Natural Gas | - | - |
MMBtu
|
- |
| Waste | - | |||
| Productivity/Other | - | |||
| TOTAL | - | |||
| *May be negative reflecting an increased cost component required to save energy and costs overall | ||||