ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Chemical and fertilizer mineral mining, not elsewhere classified
3+ Characters Required for Products

4

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $800k 107k
MMBtu
$7.66
- Electrical $402k 9,124k
kWh
$0.055
- Natural Gas $75k 13k
MMBtu
$4.13

24

Recommendations

6.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $26k 3.3k
MMBtu
3.1%
- Electrical $13k 321k
kWh
3.5%
- Natural Gas $1.5k -
MMBtu
-
Waste -
Productivity/Other $62k
TOTAL $87k
*May be negative reflecting an increased cost component required to save energy and costs overall

4

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $800k 107k
MMBtu
$7.66
- Electrical $402k 9,124k
kWh
$0.055
- Natural Gas $75k 13k
MMBtu
$4.13

7

Implemented Recommendations

1.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $11k 2.7k
MMBtu
2.5%
- Electrical $11k 259k
kWh
2.8%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other $1.4k
TOTAL $13k