ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Phosphate rock
3+ Characters Required for Products

1

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $4,192k 774k
MMBtu
$5.42
- Electrical $2,397k 75,191k
kWh
$0.032
- Natural Gas $26k 3.3k
MMBtu
$8.00

6

Recommendations

6.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $1,155k 392k
MMBtu
50.7%
- Electrical $1,370k 38,248k
kWh
50.9%
- Natural Gas ($-1,129.3)k -
MMBtu
-
Waste $150k
Productivity/Other $3,757k
TOTAL $5,063k
*May be negative reflecting an increased cost component required to save energy and costs overall

1

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $4,192k 774k
MMBtu
$5.42
- Electrical $2,397k 75,191k
kWh
$0.032
- Natural Gas $26k 3.3k
MMBtu
$8.00

3

Implemented Recommendations

3.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $362k 14k
MMBtu
1.8%
- Electrical $193k 1,342k
kWh
1.8%
- Natural Gas -
-
MMBtu
-
Waste $142k
Productivity/Other -
TOTAL $505k
*May be negative reflecting an increased cost component required to save energy and costs overall