ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Potash, soda, and borate minerals
3+ Characters Required for Products

1

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $50,303k 15,778k
MMBtu
$3.19
- Electrical $374k 15,722k
kWh
$0.024
- Natural Gas $22,684k 6,778k
MMBtu
$3.35

7

Recommendations

7.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $1,940k 535k
MMBtu
3.4%
- Electrical $930k 52,218k
kWh
332.1%
- Natural Gas $2,656k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $1,940k
*May be negative reflecting an increased cost component required to save energy and costs overall

1

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $50,303k 15,778k
MMBtu
$3.19
- Electrical $374k 15,722k
kWh
$0.024
- Natural Gas $22,684k 6,778k
MMBtu
$3.35

3

Implemented Recommendations

3.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $729k -
MMBtu
-
- Electrical -
-
kWh
-
- Natural Gas $2,618k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $729k
*May be negative reflecting an increased cost component required to save energy and costs overall