ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Clay, ceramic, and refractory minerals, not elsewhere classified
3+ Characters Required for Products

1

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $115k 13k
MMBtu
$8.95
- Electrical $83k 1,151k
kWh
$0.072
- Natural Gas $10k 1.0k
MMBtu
$10.11

7

Recommendations

7.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $16k 1.7k
MMBtu
13.3%
- Electrical $12k 167k
kWh
14.5%
- Natural Gas $3.2k -
MMBtu
-
Waste $131k
Productivity/Other ($-45.8)k
TOTAL $102k
*May be negative reflecting an increased cost component required to save energy and costs overall

1

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $115k 13k
MMBtu
$8.95
- Electrical $83k 1,151k
kWh
$0.072
- Natural Gas $10k 1.0k
MMBtu
$10.11

5

Implemented Recommendations

5.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $11k 1.1k
MMBtu
8.4%
- Electrical $7.6k 106k
kWh
9.2%
- Natural Gas $3.2k -
MMBtu
-
Waste $131k
Productivity/Other ($-45.8)k
TOTAL $97k
*May be negative reflecting an increased cost component required to save energy and costs overall