ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Industrial sand
3+ Characters Required for Products

10

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,179k 356k
MMBtu
$6.77
- Electrical $904k 16,381k
kWh
$0.057
- Natural Gas $748k 170k
MMBtu
$3.84

76

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $125k 9.1k
MMBtu
2.6%
- Electrical $50k 886k
kWh
5.4%
- Natural Gas $38k -
MMBtu
-
Waste $0.3k
Productivity/Other $122k
TOTAL $248k
*May be negative reflecting an increased cost component required to save energy and costs overall

9

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,121k 338k
MMBtu
$6.94
- Electrical $953k 17,082k
kWh
$0.058
- Natural Gas $697k 145k
MMBtu
$3.93

32

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $30k 4.1k
MMBtu
1.2%
- Electrical $22k 397k
kWh
2.3%
- Natural Gas $4.2k -
MMBtu
-
Waste -
Productivity/Other $18k
TOTAL $49k
*May be negative reflecting an increased cost component required to save energy and costs overall