ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Construction sand and gravel
3+ Characters Required for Products

9

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,373k 296k
MMBtu
$8.53
- Electrical $982k 21,642k
kWh
$0.061
- Natural Gas $82k 55k
MMBtu
$0.17

45

Recommendations

5.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $102k 12k
MMBtu
4.0%
- Electrical $36k 1,156k
kWh
5.3%
- Natural Gas ($-4.0)k -
MMBtu
-
Waste -
Productivity/Other $157k
TOTAL $260k
*May be negative reflecting an increased cost component required to save energy and costs overall

9

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,373k 296k
MMBtu
$8.53
- Electrical $982k 21,642k
kWh
$0.061
- Natural Gas $82k 55k
MMBtu
$0.17

16

Implemented Recommendations

1.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $11k (-1.2)k
MMBtu
(-0.4)%
- Electrical ($-12.4)k (-112.6)k
kWh
(-0.5)%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other $53k
TOTAL $65k
*May be negative reflecting an increased cost component required to save energy and costs overall