ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Construction sand and gravel
3+ Characters Required for Products

12

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,378k 243k
MMBtu
$12.80
- Electrical $923k 17,207k
kWh
$0.086
- Natural Gas $62k 41k
MMBtu
$0.12

57

Recommendations

4.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $179k 9.5k
MMBtu
3.9%
- Electrical $39k 929k
kWh
5.4%
- Natural Gas ($-81.4)k -
MMBtu
-
Waste $4.4k
Productivity/Other $240k
TOTAL $423k
*May be negative reflecting an increased cost component required to save energy and costs overall

10

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,601k 290k
MMBtu
$9.26
- Electrical $1,074k 20,445k
kWh
$0.074
- Natural Gas $74k 49k
MMBtu
$0.15

19

Implemented Recommendations

1.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $118k (-0.5)k
MMBtu
(-0.2)%
- Electrical ($-1.5)k (-52.0)k
kWh
(-0.3)%
- Natural Gas ($-94.1)k -
MMBtu
-
Waste -
Productivity/Other $111k
TOTAL $229k
*May be negative reflecting an increased cost component required to save energy and costs overall