ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Sand and gravel
3+ Characters Required for Products

21

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,833k 309k
MMBtu
$8.83
- Electrical $956k 17,616k
kWh
$0.071
- Natural Gas $391k 105k
MMBtu
$1.90

128

Recommendations

6.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $161k 9.8k
MMBtu
3.2%
- Electrical $47k 956k
kWh
5.4%
- Natural Gas ($-28.3)k -
MMBtu
-
Waste $0.2k
Productivity/Other $160k
TOTAL $321k
*May be negative reflecting an increased cost component required to save energy and costs overall

21

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,833k 309k
MMBtu
$8.83
- Electrical $956k 17,616k
kWh
$0.071
- Natural Gas $391k 105k
MMBtu
$1.90

59

Implemented Recommendations

2.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $86k 1.9k
MMBtu
0.6%
- Electrical $12k 183k
kWh
1.0%
- Natural Gas ($-43.0)k -
MMBtu
-
Waste -
Productivity/Other $105k
TOTAL $190k
*May be negative reflecting an increased cost component required to save energy and costs overall