ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Sand and gravel
3+ Characters Required for Products

18

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,747k 317k
MMBtu
$7.73
- Electrical $968k 19,362k
kWh
$0.059
- Natural Gas $389k 100k
MMBtu
$2.05

115

Recommendations

6.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $108k 11k
MMBtu
3.4%
- Electrical $45k 1,041k
kWh
5.4%
- Natural Gas $19k -
MMBtu
-
Waste $0.2k
Productivity/Other $88k
TOTAL $196k
*May be negative reflecting an increased cost component required to save energy and costs overall

18

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,747k 317k
MMBtu
$7.73
- Electrical $968k 19,362k
kWh
$0.059
- Natural Gas $389k 100k
MMBtu
$2.05

48

Implemented Recommendations

2.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $21k 1.5k
MMBtu
0.5%
- Electrical $4.8k 142k
kWh
0.7%
- Natural Gas $2.1k -
MMBtu
-
Waste -
Productivity/Other $36k
TOTAL $57k
*May be negative reflecting an increased cost component required to save energy and costs overall