The ITAC Statistics page displays the average assessment results for the selected criteria.
1
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $308k | 34k |
MMBtu
|
$9.05 |
- Electrical | $153k | 2,284k |
kWh
|
$0.067 |
- Natural Gas | - | - |
MMBtu
|
- |
6
Recommendations
6.0
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $17k | 2.1k |
MMBtu
|
6.1% |
- Electrical | $12k | 203k |
kWh
|
8.9% |
- Natural Gas | - | - |
MMBtu
|
- |
Waste | - | |||
Productivity/Other | $0.6k | |||
TOTAL | $17k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
1
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $308k | 34k |
MMBtu
|
$9.05 |
- Electrical | $153k | 2,284k |
kWh
|
$0.067 |
- Natural Gas | - | - |
MMBtu
|
- |
3
Implemented Recommendations
3.0
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $5.8k | 1.0k |
MMBtu
|
2.8% |
- Electrical | $5.1k | 93k |
kWh
|
4.1% |
- Natural Gas | - | - |
MMBtu
|
- |
Waste | - | |||
Productivity/Other | $0.6k | |||
TOTAL | $6.4k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |