ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Oil and gas extraction
3+ Characters Required for Products

5

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,133k 416k
MMBtu
$4.89
- Electrical $549k 10,048k
kWh
$0.053
- Natural Gas $466k 313k
MMBtu
$0.52

34

Recommendations

6.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $231k 19k
MMBtu
4.5%
- Electrical $107k 1,812k
kWh
18.0%
- Natural Gas $120k -
MMBtu
-
Waste -
Productivity/Other $16k
TOTAL $246k
*May be negative reflecting an increased cost component required to save energy and costs overall

5

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,133k 416k
MMBtu
$4.89
- Electrical $549k 10,048k
kWh
$0.053
- Natural Gas $466k 313k
MMBtu
$0.52

12

Implemented Recommendations

2.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $112k 1.8k
MMBtu
0.4%
- Electrical $9.7k 172k
kWh
1.7%
- Natural Gas $100k -
MMBtu
-
Waste -
Productivity/Other $15k
TOTAL $127k
*May be negative reflecting an increased cost component required to save energy and costs overall