ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Copper ores
3+ Characters Required for Products

3

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $18,319k 8,448k
MMBtu
$4.11
- Electrical $4,172k 169,080k
kWh
$0.016
- Natural Gas $3,555k 889k
MMBtu
$1.33

20

Recommendations

6.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $3,076k 1,198k
MMBtu
14.2%
- Electrical $2,915k 116,841k
kWh
69.1%
- Natural Gas $1,718k -
MMBtu
-
Waste -
Productivity/Other $512k
TOTAL $3,589k
*May be negative reflecting an increased cost component required to save energy and costs overall

3

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $18,319k 8,448k
MMBtu
$4.11
- Electrical $4,172k 169,080k
kWh
$0.016
- Natural Gas $3,555k 889k
MMBtu
$1.33

9

Implemented Recommendations

3.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $242k 41k
MMBtu
0.5%
- Electrical $99k 3,957k
kWh
2.3%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other -
TOTAL $242k
*May be negative reflecting an increased cost component required to save energy and costs overall