ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Crop services
3+ Characters Required for Products

8

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $680k 53k
MMBtu
$16.00
- Electrical $462k 5,063k
kWh
$0.11
- Natural Gas $9.2k 0.9k
MMBtu
$4.42

51

Recommendations

6.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $101k 8.1k
MMBtu
15.2%
- Electrical $71k 787k
kWh
15.5%
- Natural Gas $0.5k -
MMBtu
-
Waste $12k
Productivity/Other $41k
TOTAL $154k
*May be negative reflecting an increased cost component required to save energy and costs overall

7

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $755k 60k
MMBtu
$15.34
- Electrical $506k 5,685k
kWh
$0.096
- Natural Gas $10k 1.0k
MMBtu
$3.00

31

Implemented Recommendations

4.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $69k 6.3k
MMBtu
10.5%
- Electrical $47k 615k
kWh
10.8%
- Natural Gas $0.6k -
MMBtu
-
Waste $12k
Productivity/Other $44k
TOTAL $125k
*May be negative reflecting an increased cost component required to save energy and costs overall