ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Agricultural services
3+ Characters Required for Products

9

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $637k 50k
MMBtu
$15.65
- Electrical $443k 4,747k
kWh
$0.11
- Natural Gas $8.2k 0.8k
MMBtu
$3.93

54

Recommendations

6.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $91k 7.2k
MMBtu
14.5%
- Electrical $64k 706k
kWh
14.9%
- Natural Gas $0.5k -
MMBtu
-
Waste $10k
Productivity/Other $36k
TOTAL $138k
*May be negative reflecting an increased cost component required to save energy and costs overall

7

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $755k 60k
MMBtu
$15.34
- Electrical $506k 5,685k
kWh
$0.096
- Natural Gas $10k 1.0k
MMBtu
$3.00

31

Implemented Recommendations

4.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $69k 6.3k
MMBtu
10.5%
- Electrical $47k 615k
kWh
10.8%
- Natural Gas $0.6k -
MMBtu
-
Waste $12k
Productivity/Other $44k
TOTAL $125k
*May be negative reflecting an increased cost component required to save energy and costs overall