ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Horticultural specialties
3+ Characters Required for Products

4

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $420k 36k
MMBtu
$12.18
- Electrical $255k 2,898k
kWh
$0.085
- Natural Gas $2.2k 0.3k
MMBtu
$1.86

24

Recommendations

6.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $193k 10k
MMBtu
28.2%
- Electrical $87k 991k
kWh
34.2%
- Natural Gas $2.2k -
MMBtu
-
Waste -
Productivity/Other $35k
TOTAL $228k
*May be negative reflecting an increased cost component required to save energy and costs overall

3

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $525k 43k
MMBtu
$13.71
- Electrical $322k 3,446k
kWh
$0.099
- Natural Gas -
-
MMBtu
-

7

Implemented Recommendations

2.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $8.1k 0.8k
MMBtu
1.9%
- Electrical $7.5k 80k
kWh
2.3%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other $31k
TOTAL $39k
*May be negative reflecting an increased cost component required to save energy and costs overall