ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Fruits and tree nuts
3+ Characters Required for Products

4

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $432k 183k
MMBtu
$2.28
- Electrical $261k 17,281k
kWh
$0.015
- Natural Gas $62k 6.3k
MMBtu
$7.80

14

Recommendations

3.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $14k 2.6k
MMBtu
1.4%
- Electrical $4.4k 256k
kWh
1.5%
- Natural Gas -
-
MMBtu
-
Waste $215k
Productivity/Other $7.2k
TOTAL $236k
*May be negative reflecting an increased cost component required to save energy and costs overall

4

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $432k 183k
MMBtu
$2.28
- Electrical $261k 17,281k
kWh
$0.015
- Natural Gas $62k 6.3k
MMBtu
$7.80

9

Implemented Recommendations

2.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $12k 1.7k
MMBtu
0.9%
- Electrical $2.8k 167k
kWh
1.0%
- Natural Gas -
-
MMBtu
-
Waste $215k
Productivity/Other -
TOTAL $226k
*May be negative reflecting an increased cost component required to save energy and costs overall