ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Agricultural production crops
3+ Characters Required for Products

10

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $543k 117k
MMBtu
$7.65
- Electrical $292k 10,793k
kWh
$0.053
- Natural Gas $26k 2.7k
MMBtu
$4.70

46

Recommendations

4.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $102k 5.2k
MMBtu
4.4%
- Electrical $38k 508k
kWh
4.7%
- Natural Gas $0.9k -
MMBtu
-
Waste $86k
Productivity/Other $17k
TOTAL $205k
*May be negative reflecting an increased cost component required to save energy and costs overall

9

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $592k 129k
MMBtu
$7.66
- Electrical $318k 11,853k
kWh
$0.055
- Natural Gas $28k 2.8k
MMBtu
$4.39

17

Implemented Recommendations

1.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $28k 1.0k
MMBtu
0.8%
- Electrical $3.8k 101k
kWh
0.9%
- Natural Gas -
-
MMBtu
-
Waste $95k
Productivity/Other $10k
TOTAL $133k
*May be negative reflecting an increased cost component required to save energy and costs overall