ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Administration of environmental quality programs
SIC 2+ Digits Required
3+ Characters Required for Products

2

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $190k 22k
MMBtu
$8.67
- Electrical $127k 1,927k
kWh
$0.067
- Natural Gas $28k 2.7k
MMBtu
$9.08

7

Recommendations

3.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $64k 6.8k
MMBtu
30.2%
- Electrical $44k 662k
kWh
34.4%
- Natural Gas $13k -
MMBtu
-
Waste -
Productivity/Other $11k
TOTAL $75k
*May be negative reflecting an increased cost component required to save energy and costs overall

1

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $212k 28k
MMBtu
$7.70
- Electrical $170k 2,626k
kWh
$0.065
- Natural Gas $5.0k 0.7k
MMBtu
$7.67

1

Implemented Recommendations

1.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $29k 4.0k
MMBtu
14.3%
- Electrical $25k 385k
kWh
14.7%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other $0.8k
TOTAL $30k
*May be negative reflecting an increased cost component required to save energy and costs overall