ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Justice, public order, and safety activities
SIC 2+ Digits Required
3+ Characters Required for Products

2

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $65k 6.4k
MMBtu
$9.80
- Electrical $36k 542k
kWh
$0.075
- Natural Gas $9.2k 0.8k
MMBtu
$11.99

10

Recommendations

5.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $14k 1.5k
MMBtu
23.9%
- Electrical $11k 149k
kWh
27.5%
- Natural Gas $3.3k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $14k
*May be negative reflecting an increased cost component required to save energy and costs overall

1

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $101k 9.7k
MMBtu
$10.49
- Electrical $47k 797k
kWh
$0.059
- Natural Gas $16k 1.5k
MMBtu
$10.63

3

Implemented Recommendations

3.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $6.6k 0.6k
MMBtu
6.3%
- Electrical $3.5k 60k
kWh
7.5%
- Natural Gas $3.1k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $6.6k