ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Other general government support
SIC 2+ Digits Required
3+ Characters Required for Products

9

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $65k 6.5k
MMBtu
$10.49
- Electrical $49k 525k
kWh
$0.093
- Natural Gas $8.5k 1.1k
MMBtu
$7.43

45

Recommendations

5.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $13k 1.2k
MMBtu
17.7%
- Electrical $11k 112k
kWh
21.4%
- Natural Gas $1.7k -
MMBtu
-
Waste -
Productivity/Other $0.0k
TOTAL $13k
*May be negative reflecting an increased cost component required to save energy and costs overall

4

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $69k 7.8k
MMBtu
$9.15
- Electrical $46k 624k
kWh
$0.071
- Natural Gas $13k 1.4k
MMBtu
$8.60

4

Implemented Recommendations

1.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $0.9k 0.0k
MMBtu
0.4%
- Electrical $0.2k 2.8k
kWh
0.4%
- Natural Gas $0.7k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $0.9k
*May be negative reflecting an increased cost component required to save energy and costs overall