The ITAC Statistics page displays the average assessment results for the selected criteria.
17
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $108k | 11k |
MMBtu
|
$11.15 |
- Electrical | $77k | 944k |
kWh
|
$0.088 |
- Natural Gas | $8.6k | 1.0k |
MMBtu
|
$8.18 |
81
Recommendations
4.8
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $18k | 1.9k |
MMBtu
|
18.2% |
- Electrical | $15k | 189k |
kWh
|
20.0% |
- Natural Gas | $1.3k | - |
MMBtu
|
- |
Waste | - | |||
Productivity/Other | $0.0k | |||
TOTAL | $18k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
10
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $137k | 14k |
MMBtu
|
$10.58 |
- Electrical | $103k | 1,262k |
kWh
|
$0.085 |
- Natural Gas | $9.0k | 1.0k |
MMBtu
|
$7.18 |
19
Implemented Recommendations
1.9
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $12k | 1.3k |
MMBtu
|
9.6% |
- Electrical | $11k | 130k |
kWh
|
10.3% |
- Natural Gas | $0.3k | - |
MMBtu
|
- |
Waste | - | |||
Productivity/Other | $0.0k | |||
TOTAL | $12k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |