Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Business associations
SIC 2+ Digits Required
3+ Characters Required for Products

5

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $62k 6.5k
MMBtu
$9.49
- Electrical $49k 605k
kWh
$0.083
- Natural Gas $3.1k 0.3k
MMBtu
$2.14

18

Recommendations

3.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $18k 2.2k
MMBtu
34.3%
- Electrical $17k 217k
kWh
35.9%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other -
TOTAL $18k
*May be negative reflecting an increased cost component required to save energy and costs overall

2

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $61k 6.2k
MMBtu
$9.79
- Electrical $46k 536k
kWh
$0.087
- Natural Gas $7.8k 0.7k
MMBtu
$5.36

6

Implemented Recommendations

3.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $13k 1.5k
MMBtu
23.7%
- Electrical $12k 144k
kWh
26.9%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other -
TOTAL $13k